![]() ![]() This waste is currently stored in two separate buildings - solidified radioactive waste storage building and low-level solid radioactive waste storage building - which were built with the plant for the purpose of interim (pre-disposal) storage. The officials said that during nine years of operation C-1 had produced radioactive waste as per capacity of the plant. The project would provide tested nuclear fuel for safe and reliable operation of the NPPs and to avoid dependency upon other nuclear fuel supplier countries. The safe and reliable operation of nuclear power plants (NPPs) depends on tested/qualified nuclear fuel. It was imperative to diversify the fuel mix for future power generation, he added.Īccordingly, the Energy Security Action Plan (ESAP) has envisaged increasing the share of nuclear power from one per cent to 4.2 per cent by installing 8800MW nuclear power plants by 2030.Ī strategy has been developed to meet the growing demand for power by exploitation of indigenous resources, that is hydro, coal, natural gas and nuclear and by indigenisation of nuclear power technology. Besides, their prices in the international market are very vulnerable,” said a senior official of the Planning Commission. The officials said the main function of NPWC building was to store the radioactive waste during the plant operation and outage with facilities like fire protection system, water supply and drainage system, electrical system, fire alarm system, communication system, public address system and ventilation system (fresh air supply unit and air cleaning unit).Īt present the country's dependence for power generation is 34.3 per cent on gas and 32.1 per cent on oil. The second civil work includes one low level solid radioactive waste storage building (RS) for storage of all types of solid wastes. The project is scheduled to be operational from January 2013 for waste categories like compacted solid radioactive waste, non-compactable miscellaneous solid radioactive waste, cement solidified waste (produced from solidification of spent resin and liquid waste), spent process filters and ventilation system filters and undefined/unexpected solid waste.Ĭivil works to be undertaken under the project consist of one solidified radioactive waste storage building (SR) for storage of cement solidified waste of liquid waste for both C-1 and C-2 and cement solidification of spent resin already stored at C-1. Planning Commission officials said the NPWC would provide storage for the two nuclear plants till year 2021. ISLAMABAD, Nov 27 The government plans to set up a new body - the Nuclear Power Waste Chashma (NPWC) - at a cost of Rs850 million for pre-disposal storage of hazardous radioactive waste produced after electricity generation by the Chashma Nuclear Power Plant C-1 and C-2.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |